| Substrate | 1 x Concrete Manhole used in Trunk Line Sewer, Size = 1050 dia x 2.7m deep + biscuit |
| Condition | The manhole was in need of repair due to severe high levels of H2S attack and erosion |
| Preparation | The chamber was vented above and below the chamber on the sewer line and then an air mover was used to increase the ventilation and airflow. A high pressure power wash was followed by acid etch, wash down and then dried using the air mover. |
| Spray Application Spraying took 1.5 hours including the preparation. 1 coat of Epoxy was applied at 6mm using approx 40 gallons of Epoxy resin | |
| Outcome | Redlands Shire Council were impressed with the outcome, more work followed. |